Who tests, and what the county charges

Pick a county that has a sourced file. The lookup, the month check, the sortable comparison, and the checklist all read that same file. Nothing here is estimated.

Choose a county to see who can do the test, which method the county requires, the published county fee, and where to apply. Only counties with a sourced file are listed.

Compare the sourced counties

Sort by the county charge we could verify. The charge is not the same product in every row. Read the fee label before you compare a $200 application with a $3,023 permit.

Boulder CountyColoradoEngineer or geologistSoil profile pitsNew construction permit, $3,023
Larimer CountyColoradoEngineer, or a technician under an engineerTwo profile pits; perc test optionalNew permit, $1,881
Gwinnett CountyGeorgiaCertified soil classifier, then the countyLevel 3 soil reportResidential evaluation, permit, and first inspection, $275
Montgomery CountyMarylandCounty inspectorCounty perc test, after a water-table testConventional perc test, $970.11 per visit
Washtenaw CountyMichiganCounty evaluation, with the design engineerBackhoe soil pitsNew soil evaluation, $559
Wake CountyNorth CarolinaCounty staffCounty soil and site visitNew individual IP + CA, $800
Clackamas CountyOregonCounty soil scientistOpen test pitsResidential site evaluation, $1,780
Fairfax CountyVirginiaPrivate evaluator, county checkProfiles, plus perc or hydraulic conductivityCounty new-construction application, $200
King CountyWashingtonLicensed designerSoil logs, not a perc rateGravity design review, $731
Pierce CountyWashingtonDesigner or engineerDesigner soil test pitsSingle-family design application, $1,020
Thurston CountyWashingtonDesigner, soil scientist, or health officerSoil-log pits, plus a wet-season study only when requiredSee the 2026 fee schedule

What the tool will and will not answer

The county charge is the fee a health department or permitting office prints. It might be a design review, a site evaluation, a percolation visit, or a whole construction permit. The column is sortable so you can see the range. It is not a ranking of which county is cheaper to build in, because the line items are different products and because the engineer, classifier, or excavator is usually a separate bill.

The month check uses only the seasonal rule in that county's file. A county with no published window is reported that way. A partial month, such as Montgomery County's wet season ending on April 15, is labeled as partial. Fairfax County's shallow-system rule depends on rainfall averages at two airports, so the tool refuses to invent a calendar.

The checklist is the preparation the county's own page asks for: flagging, pit dimensions, who has to be licensed, what to upload. Checkboxes stay in your browser. Print them if you want paper at the lot. The tool does not store the address, the month, or the checks.

Counties in the file

Boulder County, Larimer County, Gwinnett County, Montgomery County, Washtenaw County, Wake County, Clackamas County, Fairfax County, King County, Pierce County, Thurston County. Each guide has its own section outline, the sources used, and the date those pages were read. Adding a county waits on an official fee or rule page, not on a template. Read how a county gets in or the difference between a perc test and a soil evaluation.

Sources

  1. Boulder County: OWTS permits and fees
  2. Larimer County: 2026 environmental health fees
  3. Gwinnett County: Gwinnett environmental health fee schedule, effective January 1, 2026
  4. Montgomery County: Well and septic fees, July 1, 2026 to June 30, 2027
  5. Washtenaw County: 2026 environmental health fee schedule
  6. Wake County: Wastewater fees
  7. Clackamas County: Septic fees
  8. Fairfax County: Onsite sewage and private well program
  9. King County: OSS permitting fees through 2026
  10. Pierce County: Fee schedule page
  11. Thurston County: Article IV PDF published by the county