Oregon
Clackamas County soil scientists read pits you dig before they arrive
In Clackamas County the site evaluation is a county soil-scientist visit, and the pits are supposed to be open when you apply. The published residential fee is $1,780 per lot, and that total includes the state surcharge.
Last verified against the county pages linked below. Fees and seasons change. The office on the application is the authority.
You dig, they read
The site-evaluation guide says a soil and site evaluation is how the county decides whether a septic system can be approved, including a standard system, pressure distribution, an advanced treatment unit, or a sand filter. The smallest system the rules allow for that soil is what gets written down. If the minimum in OAR 340-071 cannot be met, you get a denial that explains why. An approval is not an installation permit. The owner applies for that separately.
The visit is a county visit. The guide talks about soil scientists completing the evaluation, offers a call before the visit, and tells you to email SepticInfo@Clackamas.us. It also says pets can keep those soil scientists from finishing. Nothing on the guide tells you to hire a private perc tester. Your job is the pits, the site plan, and the fee.
Four pits is the recommendation, six is the cap
Pits have to be open when you apply. If they are not open when staff arrive, the guide says a re-inspection fee may apply and the evaluation is moved. OAR 340-071, as the county describes it, requires at least two pits. Clackamas recommends four on a new lot, split between the primary area and the replacement area, and it will look at no more than six on one application. Space them 75 to 100 feet apart, on the driest ground you actually want to use, and outside the setbacks.
The standard pit in the current guide is specific. The bottom is at least 2 feet wide and 4 feet long. The depth is at least 4.5 feet and not more than 5 feet. Spoil stays at least 2 feet from the edge. Label the pit with a stake and bright tape, mark a path if the holes are hard to find, and flag the property corners. Silt and clay need a stepped entrance in the wet months, which the guide says are usually October through June. That is a safety cut, not a rule that evaluation stops in July.
$1,780 already includes the state surcharge
The septic fee page lists a single-family site evaluation at $1,780 per lot. A note says the figure includes the Oregon DEQ surcharge under ORS 454.725, and a separate line shows that surcharge at $159. The fiscal year 2027 schedule breaks the same $1,780 into a $1,616 county amount, a $5 technology fee, and the $159 surcharge. A commercial or community system is $1,780 for the first 1,000 gallons and $236 for each additional 500 gallons. One lot, one application, one fee. The surcharge is not optional and, on the fee sheet, not refundable.
Applications go through Development Direct. The guide says visits are lined up by when the complete application and the payment arrive, that the county cannot offer a chosen appointment, and that staff will call first if you ask. No validity period for the written approval is stated on the fee page or the guide, so this page does not invent one. Soil depth, slope, wells, cuts, and whether sewer is legally and physically available are the factors the guide says actually decide the lot.
Dig the pits, then open Development Direct
- Dig the pits before you apply. If they are not open at the inspection, the county says a re-inspection fee may apply and the visit is rescheduled.
- Plan four pits on a new lot if you can, two in the primary area and two in the replacement area. Two is the minimum the county attributes to OAR 340-071. Six is the most the county will look at per application.
- Make the bottom at least 2 feet wide and 4 feet long. Dig at least 4.5 feet and no more than 5 feet, unless a restriction stops you. Keep the spoil pile at least 2 feet back from the edge.
- Space pits about 75 to 100 feet apart, on the driest ground you intend to use, outside the setbacks.
- For silt or clay, cut a stepped entrance during the wet months, usually October through June.
- Stake the pits with bright tape, mark the property corners, and write down the gate code and any animals. The guide says pets can stop a soil scientist from finishing the visit.
Start here: Site evaluation guide. SepticInfo@Clackamas.us. Or compare this county with the others in the county requirements tool.
Washington counties that license a private designer instead
- King County, Washington: licensed designer, soil logs, not a perc rate.
- Pierce County, Washington: designer or engineer, designer soil test pits.
- Thurston County, Washington: designer, soil scientist, or health officer, soil-log pits, plus a wet-season study only when required.
Preparing ground for someone else's soil call
- Perc test vs. soil evaluation: what's the difference?
- When to schedule a perc test (and seasonal limits)
- How to prepare for a perc test