Washington
Thurston County separates the soil log from a wet-season water study
Thurston County will accept a soil evaluation from a designer, a soil scientist, or the health officer, and it will not treat a wet-season groundwater study as the default. The study is what happens when the log cannot show the high water table.
Last verified against the county pages linked below. Fees and seasons change. The office on the application is the authority.
Three kinds of people may log the soil
Article IV, section 10.2 draws a line King County's code does not. Soil evaluations have to be done by a designer, a soil scientist, or the health officer. Site evaluations have to be done by a designer or the health officer. A soil scientist can describe the soil and still not be the person who signs the site evaluation.
Unless the health officer allows a shorter log, the record needs two pits in the initial soil dispersal component and one in the reserve. The applicant digs them deep enough to meet the vertical-separation table, or stops at a water table or restrictive layer. The log has to cover texture, structure, color, compaction, and the elevation of the highest seasonal water table, along with wells, cuts, buildings, and the other features the section lists. The codes index dates the current Article IV to April 1, 2025. The article text this page quotes is the PDF the county publishes at the link below.
A wet-season study is a second step
Section 10.4.1 says the health officer shall require water-table measurements during months of probable high water if there is not enough information to determine the highest seasonal water table. When that study is required or requested, the health officer renders a decision on the water-table height within 12 months of the application if precipitation is representative for the region, and not before the study is finished. A longer study can be required if rainfall is not typical.
The same section says the health officer may accept a soil scientist's technical justification, with a designer's assessment, instead of those measurements, if the report meets the policies adopted for that substitution. So a Thurston file can be a soil log alone, a log plus a wet-season study, or a log plus a written justification. It is not automatically a winter monitoring project, and the code does not hand you a month-by-month open-and-closed calendar.
The clock is in the code; the price is on another page
For anything other than a repair, section 8.3.3 says the on-site sewage application expires one year after the application date. The applicant can get a single one-year extension at no charge by asking in writing before that date. A design revision does not reset the date. The permit expires three years after conditional site approval. If a building permit is obtained during that three-year stretch, the septic permit stays valid for three years or for as long as the building permit is valid, whichever is greater, and in no case more than five years from the conditional site approval.
Dollar amounts are intentionally not copied here. The codes page links an Environmental Health 2026 Fee Schedule, Appendix A of Article I, effective January 1, 2026, and it announces a 5 percent technology fee on permits and applications as of that date. An older common-fee sheet is still on the county site. Using it as this year's price would ignore the technology fee. Use the 2026 appendix. Environmental health can be reached at 360-867-2685 or Environmental_Health@co.thurston.wa.us, 3000 Pacific Avenue SE, Olympia.
Decide who signs the log before you ask for a wet-season study
- Decide who is signing the soil log. Designers, soil scientists, and the health officer may evaluate soil. Only a designer or the health officer may evaluate the site.
- Plan on two test pits in the initial dispersal area and one in the reserve, unless the health officer authorizes fewer.
- Dig deep enough to judge vertical separation, and stop if you hit a water table or a restrictive layer.
- Do not assume a wet-season monitoring study is required. Article IV calls for it when the log cannot establish the high water table, and it allows a soil scientist's technical justification in place of measurements when that report meets the code.
- Read the current fee on the 2026 Appendix A schedule. This guide does not repeat older dollar amounts, because a 5 percent technology fee started January 1, 2026.
Start here: Septic permits and resources. Phone 360-867-2685. Environmental_Health@co.thurston.wa.us. Or compare this county with the others in the county requirements tool.
Pierce charges a winter review; King does not publish one
- Pierce County, Washington: designer or engineer, designer soil test pits.
- King County, Washington: licensed designer, soil logs, not a perc rate.
- Clackamas County, Oregon: county soil scientist, open test pits.
Why a wet-season study is not the same thing as a perc test
- Perc test vs. soil evaluation: what's the difference?
- The septic permit process, step by step
- When to schedule a perc test (and seasonal limits)