Washington
King County reviews a designer's soil logs
King County does not send a health inspector out to run a perc test for you. A designer evaluates the soil, the application has to include a set number of soil logs, and Public Health charges a design-review fee that depends on whether the system is gravity or pressurized.
Last verified against the county pages linked below. Fees and seasons change. The office on the application is the authority.
The designer logs the soil
Title 13.28 says an application for site-design approval covers a new installation, a repair or replacement of a failed soil-absorption system, or a modification, connection, or expansion. It has to include the plan-review fee and a plan that meets the title. The same chapter says the type of system is determined by a soil and site evaluation conducted by the designer, and the design submittal has to include that evaluation.
Statewide, WAC 246-272A-0220 says only professional engineers, designers, or the local health officer may perform soil and site evaluations, and that soil scientists may perform soil evaluations only. King County's code is the tighter local instruction: the designer does the evaluation the health officer reviews. There is no county perc-test fee on the 2026 fee sheet, because the field work is not a county service.
Five logs, placed on purpose
The design-application checklist is specific. Every application needs soil-log data, with a minimum of five logs: two in the drainfield, two in the reserve area, and one for the tank. If a sand filter, ATU, or other treatment device is more than thirty feet from the wastewater tanks, one more log goes in that area. The checklist also requires a vicinity map, detailed site plans, hydraulic calculations, and treatment-product specifications. A new design needs a critical-area designation. An urban lot needs a sewer letter on whether sewer is more or less than 200 feet from the property line.
Title 13 tells the designer to describe groundwater, including the date of the observation and the probable maximum water-table height, and to use USDA soil names. The state rule adds that the property owner prepares pits deep enough to see soil three feet below the proposed infiltrative surface, or shallower if water or a restrictive layer shows up, and is responsible for keeping the excavation from injuring anyone. King County's pages do not add a calendar that closes testing in winter.
Three years on the approval, and a slow queue
The fee PDF effective January 1, 2026 lists on-site sewage system design application review at $731 for a gravity or holding-tank system and $1,181 for a pressurized system. Those are review fees. They are not the designer's fee and not an installation permit.
Title 13.28.010 says plan approval expires three years from the date of approval unless a valid building-permit application has been accepted for the building the system was designed for. When the approval or the building permit expires, the applicant submits a new complete application and fees. Public Health's program page says review is currently slower than in the past because of a permitting-system change, staffing, and volume, and it does not give a number of days. For a technical question, the septic-expert line at 206-477-8177 is voicemail, and the page says staff call back within two to three business days. The main environmental-health line is 206-477-8050, with shorter afternoon hours on Tuesday and Thursday.
What the design checklist sends back
- Hire a licensed on-site sewage designer. Title 13 assigns the soil and site evaluation to the designer.
- Provide at least five soil logs: two in the drainfield, two in the reserve, and one at the tank. Add a log at a treatment device that sits more than 30 feet from the tanks.
- Include a vicinity map with the gate code, dogs, and how to find the well and the system site.
- Keep detailed site plans at 11 by 17 inches or smaller, with sewage-tank invert elevations and neighboring wells, systems, and stormwater.
- In an urban area, include a sewer letter stating whether the property line is more or less than 200 feet from sewer.
Start here: On-site sewage design application. Phone 206-477-8050. Or compare this county with the others in the county requirements tool.
Other Puget Sound health departments
- Pierce County, Washington: designer or engineer, designer soil test pits.
- Thurston County, Washington: designer, soil scientist, or health officer, soil-log pits, plus a wet-season study only when required.
- Clackamas County, Oregon: county soil scientist, open test pits.
Plain-language background for a design review
- Perc test vs. soil evaluation: what's the difference?
- How much does a perc test cost?
- The septic permit process, step by step