sourced county file

Who runs the perc test in your county

Look up the counties where a health department has published who does the soil work, which test is required, the county fee, and any seasonal window. The lookup uses that file only.

Try a ZIP like 30303, “Travis County” or “Columbus, OH”

Lookup

County requirements, from the health department pages

Full tool →

Choose a county to see who can do the test, which method the county requires, the published county fee, and where to apply. Only counties with a sourced file are listed.

Compare the sourced counties

Sort by the county charge we could verify. The charge is not the same product in every row. Read the fee label before you compare a $200 application with a $3,023 permit.

Boulder CountyColoradoEngineer or geologistSoil profile pitsNew construction permit, $3,023
Larimer CountyColoradoEngineer, or a technician under an engineerTwo profile pits; perc test optionalNew permit, $1,881
Gwinnett CountyGeorgiaCertified soil classifier, then the countyLevel 3 soil reportResidential evaluation, permit, and first inspection, $275
Montgomery CountyMarylandCounty inspectorCounty perc test, after a water-table testConventional perc test, $970.11 per visit
Washtenaw CountyMichiganCounty evaluation, with the design engineerBackhoe soil pitsNew soil evaluation, $559
Wake CountyNorth CarolinaCounty staffCounty soil and site visitNew individual IP + CA, $800
Clackamas CountyOregonCounty soil scientistOpen test pitsResidential site evaluation, $1,780
Fairfax CountyVirginiaPrivate evaluator, county checkProfiles, plus perc or hydraulic conductivityCounty new-construction application, $200
King CountyWashingtonLicensed designerSoil logs, not a perc rateGravity design review, $731
Pierce CountyWashingtonDesigner or engineerDesigner soil test pitsSingle-family design application, $1,020
Thurston CountyWashingtonDesigner, soil scientist, or health officerSoil-log pits, plus a wet-season study only when requiredSee the 2026 fee schedule
1 in 5 homes

EPA says about 20% of U.S. households are served by septic wastewater treatment systems.

U.S. EPA
26M+ homes

EPA says more than 26 million U.S. homes depend on septic systems.

U.S. EPA
10 to 20% fail

EPA estimates 10% to 20% of septic systems fail during their operational lifetimes.

U.S. EPA

Counties

Files with a real local difference

All sourced counties →

Boulder County, CO

Engineer or geologist. Soil profile pits. New construction permit, $3,023.

Read the county file →

Larimer County, CO

Engineer, or a technician under an engineer. Two profile pits; perc test optional. New permit, $1,881.

Read the county file →

Gwinnett County, GA

Certified soil classifier, then the county. Level 3 soil report. Residential evaluation, permit, and first inspection, $275.

Read the county file →

Montgomery County, MD

County inspector. County perc test, after a water-table test. Conventional perc test, $970.11 per visit.

Read the county file →

Washtenaw County, MI

County evaluation, with the design engineer. Backhoe soil pits. New soil evaluation, $559.

Read the county file →

Wake County, NC

County staff. County soil and site visit. New individual IP + CA, $800.

Read the county file →

Clackamas County, OR

County soil scientist. Open test pits. Residential site evaluation, $1,780.

Read the county file →

Fairfax County, VA

Private evaluator, county check. Profiles, plus perc or hydraulic conductivity. County new-construction application, $200.

Read the county file →

King County, WA

Licensed designer. Soil logs, not a perc rate. Gravity design review, $731.

Read the county file →

Pierce County, WA

Designer or engineer. Designer soil test pits. Single-family design application, $1,020.

Read the county file →

Thurston County, WA

Designer, soil scientist, or health officer. Soil-log pits, plus a wet-season study only when required. See the 2026 fee schedule.

Read the county file →

Free checklist · PDF

Before You Buy Land

A one-page printable checklist to help buyers ask smarter septic and perc-test questions before closing.

  • What to confirm with the county first
  • How to gather basic property details
  • Questions to ask before paying for site work

Free. We email you the download link, plus an occasional plain-English guide. Unsubscribe any time. We never sell your email. Privacy

Why it matters

Helpful before you spend money

Buying land without checking septic basics can create expensive surprises. The right starting point is usually the office with jurisdiction over the property, not a generic search result.

People often need a quick, practical answer: who regulates the permit, who can evaluate the soil, and where the official forms live. That is what this site is built to organize.

We keep the language plain and the path simple so you can prepare better questions, avoid common mix-ups, and move forward with more confidence.

Guides

Plain answers, sourced

All guides →

Frequently asked questions

Does Montgomery County still run the perc test?

Yes. Department of Permitting Services conducts and supervises percolation testing. Water-table tests wait for a declared wet season, typically February 1 through April 15. The conventional perc fee for July 2026 through June 2027 is $970.11 per lot, per visit.

Source rows on the Montgomery County page

Who logs the soil in King County?

A licensed designer conducts the soil and site evaluation. Public Health reviews the design. The 2026 design-review fee is $731 for a gravity or holding-tank system and $1,181 for a pressurized system. Plan approval lasts three years unless a building permit is in review.

Source rows on the King County page

Does Boulder County require a perc test?

The permit procedure requires a visual and tactile evaluation of two or more soil profile pits by a registered engineer or geologist. Perc holes, if they are dug, stay open for the county inspection. A new-construction permit is $3,023.

Source rows on the Boulder County page

When can Fairfax County evaluate a shallow system?

Only in a month that meets or exceeds the long-term composite average rainfall at Dulles and Reagan National. The county does not publish a fixed list of those months. A private soil evaluator files first, and the health department checks the work.

Source rows on the Fairfax County page