Maryland
Montgomery County still runs the percolation test
Montgomery County is one of the places where the percolation test is still a county inspection, not a private worksheet. You hire a design professional and an excavator. Department of Permitting Services staff run the test, and water-table tests wait for a declared wet season.
Last verified against the county pages linked below. Fees and seasons change. The office on the application is the authority.
The inspector, not your contractor, runs the test
The county's percolation guideline says the test is part of establishing a sewage disposal area, and that the county has to conduct and supervise it. The rate, and whether the soil can treat wastewater in both the initial area and the replacement area, is a county result. You still hire people. The plan has to be prepared by someone registered with the Maryland Board of On-Site Wastewater Professionals. After the plan is marked up, a professional engineer or licensed surveyor stakes the approved sites. An excavator licensed for on-site wastewater work digs the holes and calls the area inspector to set the day. As of January 1, 2023, the guideline says the person providing the on-site wastewater service has to hold that state license.
A permit is not what you apply for. The process page says soils testing is a service on the well and septic application. The fee is nonrefundable and due at filing. Plans move through ePlans. The submittal sheet says soil drawings are uploaded one sheet per file, with a name like SOIL0001, and that everything has to be uploaded within five business days or the application can be withdrawn and the fee forfeited.
February through mid-April, if the county declares it
Water-table tests are the support for the perc test, and they are seasonal. Both the process page and the guideline describe a declared wet season, typically February 1 through April 15, in years with ordinary precipitation. Perc tests and sand-mound tests can be done in other months once the water-table work is sufficient, unless the holes fall in restrictive soils, in which case those tests wait for the wet season too. The guideline says water-table tests are always required unless staff already have enough water-table information, and that the two tests can sometimes happen on the same visit if the schedule allows.
The season is not guaranteed. On the soils-testing page, DPS said applications for the 2026 wet season were no longer being accepted and that the season remained closed because water-table levels were too low. The same note says the department may stay open past April 15 if rain produces a sustained high water table, and that it will announce an opening by email and on the site. A month inside February, March, or early April is only the typical window. It is not a promise that testing is underway.
Each visit is its own fee
The well and septic fee table for July 1, 2026 through June 30, 2027 lists a conventional percolation test at $970.11 per lot, per visit, a mound-system perc test at $1,305.91 per lot, per visit, and a water-table check at $547.24 per visit. The table says to use it for estimating. DPS calculates the final fee when the service is provided. Because the charge is per visit, a lot that needs a water-table day and a later perc day is two fees, and a failed pattern that has to be moved is another visit.
The county does not publish a number of days for the whole process. It says testing varies and that multiple visits may be required to get enough passing holes. There is also no separate validity period printed on the fee page or the process page for how long a passing perc test can sit before you build. When the reviewer decides the testing is enough, the engineer submits a final plan. Until that sentence appears on a county page with a term of years, this guide leaves the shelf life unstated.
Stake the sites, then let the excavator call the inspector
- Hire a design professional registered with the Maryland Board of On-Site Wastewater Professionals to draw the test plan.
- File the service application in DPS eServices and pay the nonrefundable fee. Card and check are the methods the process page names.
- Upload the soil drawing as a separate file named like SOIL0001, within five business days, or the county says the filing fee can be forfeited.
- Have a licensed surveyor stake the approved test sites.
- Hire a licensed excavator to dig the holes and to call the area inspector for the date. Each water-table, perc, or mound visit is a separate fee.
- Do not plan a water-table test outside a declared wet season. The typical window is February 1 through April 15, and the county can leave the season closed.
Start here: Soils testing process. Or compare this county with the others in the county requirements tool.
Fairfax County, across the river, does not run the test
- Fairfax County, Virginia: private evaluator, county check, profiles, plus perc or hydraulic conductivity.
- Wake County, North Carolina: county staff, county soil and site visit.
- Washtenaw County, Michigan: county evaluation, with the design engineer, backhoe soil pits.
What a county perc test is measuring
- What is a perc test?
- How much does a perc test cost?
- When to schedule a perc test (and seasonal limits)