Washtenaw County charges a soil-evaluation fee, and its old guidance still sets the wet-season watch

Washtenaw County publishes a dollar amount for the soil evaluation itself. The 2026 schedule is current. The instructions for when a high water table has to be watched through the spring are older, and they are still the document the county hosts.

Last verified against the county pages linked below. Fees and seasons change. The office on the application is the authority.

By C. V. Wooster, Taciturn Studios · Updated November 21, 2026 · How we research

The soil evaluation is a line on the 2026 fee sheet

Washtenaw County Environmental Health's 2026 fee schedule, effective January 1, 2026, lists a new soil evaluation for a residential conventional system at $559 per parcel. The conventional permit is another $559 per parcel and includes up to two inspections. An alternative system is $664 for the soil evaluation, $559 for plan review, and $929 for the permit. A monitoring-tube evaluation, up to six site visits, is $559. The sheet's phone is 734-222-3800 and the office is 705 N Zeeb Road in Ann Arbor.

The installation page says a soil evaluation is required before you build a house that is not on a municipal or centralized sewer, and it links a soil-evaluation requirements page and the applications. That is the current front door. The fee tells you the county charges for the evaluation. It does not, by itself, describe the hole.

The pit instructions are the 2007 document

A county document approved by the Washtenaw County health officer on June 22, 2007 still describes the site visit. You submit a soil-evaluation application and the fee, with a plan that shows the proposed system, and you pre-stake that area. The visit is scheduled with the design engineer and a department representative both there. The owner hires the excavator. Backhoe pits develop the soil logs. The document says the number varies with how uniform the soil is, and that the minimum is two pits in the primary absorption area and two in the reserve. A competent soil consultant records thickness, USDA texture, mottles, structure, perched water, groundwater, and disturbed soil.

The department, evaluating the site with the engineer, decides whether the soil can be used and may require water-table measurements in the months when water is probably high. It may also ask for a hydrogeologic study or a mounding study. This page labels that document by its approval date on purpose. It is what the county still publishes. It is not a 2026 rewrite.

The spring watch has a deadline in a 2002 guideline

The engineering guidelines dated January 25, 2002 say that when mottling shows a seasonal high water table in the upper 12 inches, the parcel is denied, and the owner may install drainage or run a monitoring-tube study. Monitoring is done in the normally wettest part of the year and at least from February 1 through June 1. The person reporting the readings has to be a licensed professional engineer, a professional surveyor, a registered sanitarian, a certified professional geologist, or a certified professional soil scientist. Readings start the first day and continue at least every seven days. Precipitation from September 1 through May 31 has to be reported, and the result is inconclusive if that stretch is under 90 percent of normal.

Applications for that seasonal evaluation are due no later than February 1 of the year of the study. The guideline says later applications will not be accepted, and that a prior soil evaluation by the department is required. A permit needs at least 12 inches of naturally permeable soil above the high water table after any drainage attempt. None of that converts every Washtenaw soil evaluation into a February-only event. It is the rule for the high-water study in the document that states it. The 2026 fee for a monitoring-tube evaluation is the current price attached to that kind of work.

What the soil-evaluation visit expects on the ground

Start here: Installing a septic system. Phone 734-222-3800. Or compare this county with the others in the county requirements tool.

A Maryland county that still times a perc test

High water, fees, and the words on the application

The 2026 fee sheet and the two older county documents it does not replace

  1. 2026 environmental health fee schedule
  2. Installing a septic system
  3. Soil evaluation requirements
  4. Engineering guidelines, January 25, 2002
  5. Health officer approval, June 22, 2007