Colorado

Boulder County wants profile pits, then a county inspection

Boulder County's permit procedure is built around deep soil-profile pits evaluated by an engineer or geologist. The county inspects the site after the application, the soil report, and the fee are in. A new-construction permit is published at $3,023.

Last verified against the county pages linked below. Fees and seasons change. The office on the application is the authority.

By C. V. Wooster, Taciturn Studios · Updated November 21, 2026 · How we research

Start with two deep profile pits

The county's permit procedure tells you to schedule the soil analysis with a registered professional engineer or professional geologist, then hire a contractor to dig the profile pits. The required work is a visual and tactile evaluation of two or more excavations. Each pit has to reach at least four feet below the proposed infiltrative surface, which the procedure describes as the bottom of the chambers or the gravel. The same sheet says the pits are eight feet deep, dug at least 24 hours before the county inspection, flagged, and left open. Boreholes are not acceptable.

The procedure also says not to fill perc-test holes or profile holes before the inspection. So a percolation hole can be part of a file. The required piece the procedure describes is the profile, not a standalone perc rate. The 2026 regulations, section 11, say the engineer or technician marks every profile pit or percolation hole, that the intent is to backfill promptly once the evaluation is done, and that the excavator has to tell the health department before backfilling. Pits closed without a county inspection need monitoring ports so groundwater elevation can still be checked. The department may require a joint evaluation with the engineer or a competent technician.

What the $3,023 permit is paying for

The county fee table lists a new-construction permit at $3,023. The table says that amount includes one site inspection, up to two design revisions, up to one hour of consultation, one open-hole inspection if the department requires it, one final inspection, one lift-station or alarm inspection, one house-connect inspection, and the operating permit. A major repair tied to property improvements is also $3,023, with a note that those fees were effective July 1, 2024. A major repair that is not in that category is $1,823. A minor repair is $1,223.

That fee is the county permit. It is not the engineer, the excavator, or the geologist. Staff schedule the site inspection after the application, the soil report, and the fee arrive and someone has confirmed the pits exist. Incomplete directions, hidden pits, dogs, a locked gate, or an electric fence trigger a $250 re-inspection. Online filing is available for permits and property transfers. Card payments add $0.75 plus 2.25 percent, and an electronic check adds $1, according to the apply page.

The application and the permit expire on different clocks

Section 4 of the 2026 regulations says an application that never turns into a permit expires one year after the submission date. A construction permit expires one year after issuance if construction has not started. If construction has started and further inspections are still outstanding, the permit expires three years after the last inspection. A permit that has had its final inspection but is still waiting on paperwork expires one year after that last inspection. A change to the plans after issuance invalidates the permit unless the department approves the change in writing.

There is no published wet-season month for digging the pits. Weather still stops the inspection in a practical way: the road has to be reachable in a four-wheel-drive vehicle and clear of snow, and the procedure asks you to call if a storm makes the property inaccessible. Give the gate code with the application. The regulations cite Colorado's Regulation 43, 5 CCR 1002-43, for the state minimums the local rules sit on.

Leave the profile pits open and findable

Start here: Submit an OWTS application. Or compare this county with the others in the county requirements tool.

Larimer County is the next county north

Soil profiles, in less local language

The permit procedure, the fee table, and the 2026 regulations

  1. OWTS permits and fees
  2. OWTS permit procedure and application
  3. OWTS regulations
  4. Apply online