Pierce County prices the design review separately from the installation permit
Pierce County's health department will review a septic design and later permit the installation, and it publishes a different dollar amount for each. The soil log itself is the designer's or engineer's work.
Last verified against the county pages linked below. Fees and seasons change. The office on the application is the authority.
Engineers and designers own the soil call
Chapter 2, section 18 of the Tacoma-Pierce County Environmental Health Code says only professional engineers or designers may perform soil and site evaluations for an on-site sewage design. The evaluator has to log as many holes as the design needs, judge groundwater and the probable maximum height, and map wells, supply lines, surface water, bedrock, buildings, easements, cuts, driveways, existing systems, and utilities. Texture and structure follow the USDA system, with the code's own table of soil types and loading rates.
Section 19 puts the digging on the owner or the owner's agent. Pits have to be at least 24 inches in diameter and deep enough to see the profile three feet below the infiltrative surface at the bottom of the dispersal component, or they stop sooner if a water table or restrictive layer appears. The owner is responsible for keeping the hole from injuring anyone. The health department is the reviewer and the permit office, not the crew with the backhoe.
A design fee and an installation fee
The Board of Health adopted the 2026 fee schedule on December 3, 2025, effective 12:01 a.m. January 1, 2026. For on-site sewage, a single-family residential design application is $1,020. A single-family repair design is $960. The installation permit is $480, and a tank-only installation permit is $240. The fee page says the design application fees include a water-adequacy office review and apply to new, remodel, and repair applications.
Those amounts are easy to mix up with the designer's bill, which the county does not set. They are also easy to mix up with each other. Paying $1,020 gets the design reviewed. It does not buy the installation permit. A design renewal is listed at $780. The schedule does not, on the lines reviewed here, say how many years a design lasts before that renewal applies, so this page does not guess a term.
Winter water is a priced review
The same 2026 schedule lists a High Winter Water Table Review at $1,920, with an eight-hour minimum. Extra hours use the 2026 hourly rate of $240. A soil consultation for new construction or an expansion is $360. Those lines mean the department will spend staff time on winter water or on a soil question. They are not a published rule that test pits may be dug only in certain months.
Filing is through the department's online portal once you have an account. The applications page says to check spam if the account email never arrives. Paper applications go to 3629 S. D Street, MS 1035, Tacoma, WA 98418. The on-site fee sheet revised December 2025 lists the phone as (253) 649-1925.
Have the pits and the license before you pay the design fee
- Use a Washington-licensed designer or professional engineer. Chapter 2 limits soil and site evaluations for design to those two licenses.
- Dig pits at least 24 inches in diameter and three feet deeper than the infiltrative surface you expect, unless water or a restrictive layer stops you sooner.
- Have the designer record groundwater and the probable maximum height, plus wells, lines, buildings, easements, cuts, and the other features section 18 lists.
- Submit the design application and fee first. The installation permit is a later, separate fee.
- Budget the high-winter-water-table review only if the department is doing that review. It is an 8-hour minimum on the 2026 schedule, not the base design fee.
Start here: Septic applications and forms. Phone 253-649-1925. Or compare this county with the others in the county requirements tool.
King and Thurston handle the same state rule differently
- King County, Washington: licensed designer, soil logs, not a perc rate.
- Thurston County, Washington: designer, soil scientist, or health officer, soil-log pits, plus a wet-season study only when required.
- Clackamas County, Oregon: county soil scientist, open test pits.
Reading that separates a design fee from a perc test
- Perc test vs. soil evaluation: what's the difference?
- How much does a perc test cost?
- The septic permit process, step by step